March 13, 2026 · David Lund
Why General Contractors Choose Refresh for High-End Kitchen Refinishing & Painting
A predictable 5-day (or flexible 3-day) owner-performed process that integrates cleanly into complex remodel timelines.
Reliability and Scheduling
General contractors manage complex timelines where one delay impacts every subsequent trade. Refresh operates on a strict 5-day turnaround that can also flex into a 3-day on-site cabinet box process — doors are finished in-shop and reinstalled on the chosen day, often after all other trades finish to avoid dings and damage. GCs can schedule plumbers, electricians, and countertop installers with confidence.
David Lund is the owner and performs the work. There is no middleman and no rotating crew of inexperienced laborers. The owner-performed model ensures accountability and direct communication.
The 5-Day Refresh Process
- Day 1: Site protection, ZipWall containment, doors and drawers removed and labeled, HEPA filters and exhaust fans set up.
- Day 2: Cleaning, degreasing, and sanding for adhesion.
- Day 3: Two coats of primer, sanded between coats; imperfections addressed with glazing putty.
- Day 4: Premium Italian Renner 2K coatings sprayed — uniform, no brush marks, no drips.
- Day 5: Reassembly, hardware, masking removed, site cleaned.
Industrial Quality with Renner Coatings
Renner is a premium Italian brand of water-based industrial wood finishes offering durability (resists scratches, chemicals, moisture), flexibility (moves with the wood to prevent cracking), a factory appearance, and low VOC levels.
Dust-Free Prep Technology
Sanding equipment connects to HEPA-filtered vacuums, capturing dust at the source. This keeps the job site clean, protects occupant health, and ensures a debris-free finish — reducing post-construction cleanup.
A Low-Overhead, High-Quality Partnership
Refresh operates with low overhead — no expensive showroom, no large sales staff — enabling competitive pricing. If cabinet boxes are structurally sound, refinishing updates the aesthetic without the chaos of a full tear-out, speeding up the overall timeline.
Technical Standards
- Adhesion testing on each project
- Film thickness applied to specific mil targets
- Precision color matching
- Consistent sheen across all surfaces
Integrating with Other Trades
Refresh slots near the end of the sequence — after flooring, countertops, and backsplash — to prevent damage to newly refinished cabinets, though placement is flexible. A final walkthrough handles any touch-ups on the spot.
General contractors interested in a partnership can contact us for a consultation. See also Cabinet Refinishing vs. Replacement.
